Challenge
Issue: The Nairobi Pentecostal Bible College, home to over 1,500 students, required a safe, reliable, and sustainable water supply to support its large, daily operational needs.
Need: A comprehensive, end-to-end water solution that addressed all regulatory, technical, and infrastructure requirements to ensure long-term water independence.
Solution
Action: Geo Blue Engineering was contracted to deliver a complete water solution, managing the project from the initial planning stages through to full operation.
Execution:
Planning & Legal: Handled the entire hydrogeological survey and secured all necessary drilling permits and licensing.
Drilling: Executed the professional drilling of the borehole to establish the water source.
Equipping: Installed a solarized pump system to guarantee sustainable and low-cost pumping operations.
Infrastructure: Completed tank civil works (storage infrastructure) to ensure sufficient water pressure and reserve capacity for the institution’s daily demands.
Outcome
- Impact: The institution now has a fully self-sufficient water supply system that meets the needs of its large population.
- Beneficiaries: Over 1,500 students and staff at the Nairobi Pentecostal Bible College.
- Result: The college enjoys a safe and sustainable water supply, removing the dependency and high costs associated with external water sources.


